While we were walking about the house to ensure placement of switches and recepticles, the concrete truck and crew were busy pouring the entire basement floor and the garage floor.
When we went back at the end of the day, we actually had to use the front door for access to the house since the garage floor was setting. In addition, the electrician had begun placing boxes and cans throughout the second floor. Hope he is easy-going, we want to move about 4 boxes in the master bedroom. No wires are in yet, so we've been told it's not a huge deal.